Showing posts with label Crosslake. Show all posts
Showing posts with label Crosslake. Show all posts

Monday, September 13, 2021

Crosslake Fibre picks Ciena for cable across the English Channel

Crosslake Fibre has selected Ciena for a new submarine cable and terrestrial network between Slough, UK, and Paris, France.  The network, called ‘CrossChannel Fibre,’ is the first fibre cable project of its kind to be built across the busy shipping lanes of the English Channel since 2001. 

Crosslake is deploying Ciena’s 6500 packet-optical platform powered by WaveLogic 5 Extreme. Crosslake is also using Ciena’s Manage, Control and Plan (MCP) with Liquid Spectrum's Channel Margin Gauge app to allocate and scale capacity in real-time, from 600Gbps to 800Gbps, to quickly adapt to changing customer requirements and maximize the value of deployed assets.

“There hasn’t been a new fibre network across the Channel in two decades,” said Mike Cunningham, CEO, Crosslake Fibre. “We saw the need for a modern network infrastructure—one that can handle the rigorous demands of today’s digital world, but also serve generations well into the future. And that’s the vision behind CrossChannel.”

“A lot of online activities, but especially gaming and streaming, call for blazing performance and minimal delays or lag,” said Ian Clarke, Vice President of Global Submarine Solutions, Ciena. “Crosslake’s submarine cable network, with its high reliability and speedy connectivity, plays a pivotal role in elevating experiences like eSports and videoconferencing.”

http://www.crosslakefibre.ca

https://www.ciena.com/

Tuesday, July 14, 2020

Crosslake Fibre plans high-capacity cable across English Channel

Crosslake Fibre an international network provider and developer of unique subsea and terrestrial fibre networks, announced plans for a high-fibre count cable across the English Channel.

The non-repeatered, CrossChannel Fibre cable, which will connect Slough, United Kingdom and Paris, will contain 96 fibre pairs, each providing over 20 Tbps.  The system is expected be ready for service in the fall of 2021.

Crosslake Fibre has engaged EGS, a leading global provider of marine surveys and services, to undertake the marine and burial surveys for the project. Crosslake Fibre has placed the marine survey contract into force and survey activities have commenced.

“We are excited to launch this historic subsea project and deliver a new, much-needed connection across the English Channel connecting the critically important data hubs of Slough and Paris. This new fibre infrastructure has been optimized to create the shortest path between the two data hubs, providing users with an enhanced technical solution and materially lowering operating costs. With the continued increase in bandwidth demand further accelerated by the COVID-19 pandemic, subsea cables have never been more critical to the functioning of the backbone of the Internet,” comments Mike Cunningham, CEO for Crosslake Fibre. “The marine survey is an essential milestone in the development of subsea projects. That is why key partners such as EGS are important, as they have the expertise and knowledge to ensure a successful survey of the route and ultimately pave the way for an optimal deployment of the cable.”

In addition, Crosslake Fibre’s capital partner, Tiger Infrastructure Partners, has invested additional capital into the Crosslake platform to support the CrossChannel Fibre system and advance the growth and development of new projects.

Crosslake Fibre activates Toronto – New York network

Crosslake Fibre activated commercial services on the first submarine cable across Lake Ontario from Toronto, Canada to Buffalo, New York.

The diverse, ultra-low latency route connects Toronto’s largest carrier hotels, Equinix TR2 at 45 Parliament Street and 151 Front Street West, to Equinix NY4 in Secaucus, New Jersey with multiple extensions to various points-of-presence in both cities. Crosslake Fibre provides lit and dark fiber services interconnecting Toronto, Secaucus, NJ and Buffalo, NY using the route.

The historic cable traverses Lake Ontario from Toronto to New York State utilizing a specialized 192 fiber strand submarine cable that is 36 miles (58 km) in length.  Using current technology, the cable, which is less than 2 inches in diameter, can provide up to several thousand terabits per second of capacity throughput.

“The new network provides the lowest latency performance, physical geographic diversity, and ultra-high capacity throughput for customers,” states Mike Cunningham, CEO of Crosslake Fibre.  “This backbone Internet infrastructure benefits the financial markets, data centers, content delivery networks, the gaming eco-system, payment processing, and Internet download speeds, in addition to being a catalyst for economic development.”

Tuesday, January 21, 2020

Crosslake Fibre selects Equinix to terminate its Digital Gateway

Crosslake Fibre selected Equinix to extend its backhaul capacity into Equinix TR2 International Business Exchange (IBX®) data center in Toronto and Equinix NY4 IBX in Secaucus, New Jersey.

The Crosslake cable traverses Lake Ontario from Toronto to New York State utilizing a specialized 192-fiber strand submarine cable that is 36 miles (58 km) in length. For the first time, this new network route delivers sub-9 ms round trip delay (RTD) performance between Toronto and New York.

"The new network provides physical geographic diversity, the lowest latency performance and ultra-high capacity throughput. This backbone internet infrastructure between Equinix data centers benefits content delivery networks, financial customers, gaming ecosystem, payment processing customers and internet download speeds, in addition to being a potential catalyst for economic development," stated Mike Cunningham, CEO, Crosslake Fibre.